Terrace, BC · Highway 37 & Jack Talstra Way

Where industry needs to be

16.85 acres across four contiguous parcels in Terrace, British Columbia — at the junction of Highway 37 and Jack Talstra Way. Positioned between the deep-sea ports of Prince Rupert and Kitimat, with CN Rail and Highway 16 minutes away. Available for laydown yards, warehousing, office/warehouse bays, and service-commercial use. Lease or build-to-suit.

Laydown & Storage Yards Warehousing Office / Warehouse Bays Hotel / Service Commercial Build-to-Suit
Location Map — Talstra Industrial Lands Talstra Lands: 10 min from Downtown Terrace, 800m from Northwest Regional Airport, 40 min to Kitimat. Side distances: Ksi Lisims LNG ~140 km north, Prince Rupert 137 km west. HIGHWAY 37 Downtown Terrace 10 min drive ✈ Northwest Regional Airport 800 m TALSTRA LANDS Hwy 37 & Jack Talstra Way 40 min drive Kitimat Port · LNG Canada REGIONAL DISTANCES Ksi Lisims LNG ~140 km north Prince Rupert 137 km · 1.5 hr west N
Schematic · not to scale
Location Highway
16.85 ac
Total Area
4
Contiguous Parcels
137 km
to Prince Rupert
64 km
to Kitimat
M2 / M4
Industrial Zoning
Why This Site

Built for industrial users who need to move fast

Four parcels. Two zoning types. One location at the junction of Highway 37 and Jack Talstra Way in Terrace, BC — the supply-chain hub of Northwest British Columbia.

Prime Location

At the intersection of Highway 37 and Jack Talstra Way in Terrace, BC — the regional service centre for Northwest British Columbia's industrial corridor.

Laydown & Storage

16.85 acres of contiguous, divisible land — ideal for equipment staging, material laydown, and bulk storage serving LNG, mining, and port operations.

Warehousing

M2 Heavy Industrial zoning on Lots A, B, and C supports warehouse and distribution facilities — minutes from CN Rail and two deep-sea ports.

Office / Warehouse Bays

Lot D's M4 zoning permits office, restaurant, gas bar, and transportation uses — perfect for service-commercial tenants supporting the industrial park.

Hotel / Service Commercial

Lots C and D have C3 Service Commercial rezoning under review — opening the door to hotel, restaurant, and retail uses to serve the growing industrial workforce.

Build-to-Suit

Lease one parcel or all four. Flexible terms for build-to-suit, land lease, or joint venture — tailored to tenant requirements.

The Opportunity

Industrial land where the supply chain actually runs

Terrace is the service and supply centre for Northwestern British Columbia — the staging ground for the region's LNG exports, mining operations, port logistics, and heavy industrial construction. The Talstra Lands sit at the intersection of Highway 37 and Jack Talstra Way, putting 16.85 acres of contiguous, divisible industrial land directly in that corridor.

Four parcels can be leased individually or together — for land lease, laydown and storage yards, warehousing, office/warehouse bays, hotel, or service-commercial use. The site sits minutes from the Northwest Regional Airport, CN Rail, and two deep-sea ports, with Highway 16 connecting east to Prince George.

Parcel details Inquire about leasing
Location & Logistics

A regional connectivity hub

Terrace sits at the intersection of two highways, a Class-1 rail line, and two deep-sea ports — the logistics backbone of Northwest BC.

Port of Prince Rupert

Canada's third-largest container terminal and closest deep-sea port to Asia — 137 km west by uncongested highway. Ice-free, deep-water, with direct CN Rail service. The fastest North American ocean route to Asian markets.

137 kmDeep-seaCN Rail

Port of Kitimat

Home to the Rio Tinto aluminum smelter and the terminus of the Coastal GasLink pipeline — 64 km south. LNG Canada's export terminal is operational here, with Phase 2 expansion proposed to double capacity to 28 mtpa.

64 kmLNGSmelter

CN Rail Mainline

The CN mainline runs approximately 10 km from the site — BC's fastest port-to-US rail connection. The Kitsukalum First Nation is developing a break-bulk and intermodal transload facility approximately 15 km away.

~10 kmClass-1 railTransload

Highway 16 & 37

The Trans-Canada Highway 16 runs east–west through Terrace, connecting to Prince George (575 km east). Highway 37 connects north to the Alaska Highway and south to the Lakelse Lake region.

Hwy 16Hwy 37Trans-Canada

Northwest Regional Airport

Immediately adjacent to the Talstra Lands, serving Terrace and Kitimat. Offers airside and groundside commercial land and hangar opportunities for aviation-supportive industrial uses.

AdjacentAirside land

Prince George & Inland Hub

575 km east on Highway 16, Prince George is the regional supply centre for Central and Northern BC — connecting Terrace to the broader provincial distribution network and CN Rail's transcontinental route.

575 kmSupply hub

Distances and infrastructure details drawn from the City of Terrace — Skeena Industrial Development Park brochure.

The Parcels

Four contiguous parcels, individually or together

16.85 acres across four M2/M4-zoned parcels on Jack Talstra Way — lease one, several, or all.

Subdivision plan showing Lots A, B, C, and D with boundary dimensions — Plan EPP91844

Plan EPP91844 — McElhanney Associates Land Surveying Ltd. (2019). Surveyor: Todd E. Basky, BCLS 899.

Lot Address Area PID Zoning Suitable Use
A 3840 Jack Talstra Way 6.82 ac 030-917-433 M2 Heavy Industrial Laydown yard, warehousing, build-to-suit
B 3800 Jack Talstra Way 5.51 ac 030-917-441 M2 Heavy Industrial Laydown yard, warehousing
C 3760 Jack Talstra Way 2.55 ac 030-917-450 M2 Heavy Industrial Rezoning to M4 or Hotel (C3) contemplated
D 3740 Jack Talstra Way 1.97 ac 030-917-468 M4 Light Industrial Rezoning to M4 or Hotel (C3) contemplated

Lots A, B, and C carry M2 Heavy Industrial zoning; Lot D is zoned M4 Industrial Office Park. A C3 Service Commercial rezoning application is under review for Lots C and D, with potential for hotel/service-commercial use. Lot C may also be considered for rezoning from M2 to M4. All rezoning applications are subject to City of Terrace approval and are not guaranteed. All parcels are under Plan EPP91844.

Zoning Detail

M4 — Industrial Office Park: Permitted Uses

Lot D is zoned M4 under City of Terrace Zoning Bylaw No. 2069-2014, with C3 rezoning also under review. Lot C is currently M2 but may be rezoned to M4. The M4 zone provides for administration, office space, and related services for the Skeena Industrial Development Park. Minimum parcel size: 4,000 m² (0.4 ha).

Key primary uses targeted for Lot D:

Convenience Store Gas Bar Neighbourhood Pub Office Restaurant Transportation Use

Primary Uses

  • Office
  • Convenience Store
  • Restaurant
  • Gas Bar
  • Laboratory & Research Facilities
  • Media Studio
  • Printing Services
  • Technical Consulting Firm
  • Transportation Use
  • Parking Facility
  • Daycare Centre
  • Neighbourhood Pub

Secondary Uses & Regulations

  • Outdoor Storage (when screened per Section 5.0)

Key Regulations

  • Minimum parcel size: 4,000 m² (0.4 ha)
  • Outdoor storage must be screened
  • C3 Service Commercial rezoning pending for Lots C & D
  • Lot C rezoning from M2 to M4 under consideration

Source: City of Terrace Zoning Bylaw No. 2069-2014. M4 zone regulations are subject to change — verify current zoning with the City of Terrace before proceeding.

Use Cases & Tenant Fit

Built for the way Northwest BC industry operates

The parcels are suited to a range of industrial and logistics uses — lease land, build to suit, or stage your operation.

Laydown Yards

Fenced, secured storage for pipe, structural steel, heavy equipment, and project materials — serving LNG, mining, and construction supply chains.

M26.82 + 5.51 ac available

Warehousing & Distribution

Dry storage for regional distribution, parts inventory, and supply-chain staging — with direct highway and rail access.

M2 / M4Build-to-suit

Office / Warehouse Bays

Lighter-format industrial space for service companies, contractors, and trades — office and shop space in one bay.

M42.55 + 1.97 ac

Fleet & Class 8 Servicing

Truck parking, maintenance bays, and wash facilities for the hundreds of Class 8 trucks moving through Terrace weekly.

M2Highway 16 access

LNG & Mining Supply

Staging ground for LNG Canada, Coastal GasLink, and Golden Triangle mining operations — fabrication, assembly, and supply.

M264 km to Kitimat

Build-to-Suit

Lease the land and we'll work with you to design and build a facility tailored to your operation — or bring your own builder.

All parcelsFlexible terms
Regional Infrastructure

Utilities & servicing context

Regional utility infrastructure serving the broader Terrace industrial area. Site-specific connections to be confirmed during diligence.

BC Hydro
500 kV transmission line and 2,500V 3-phase distribution available in the regional industrial area. A BC Hydro substation is approximately 3 km from the Skeena Industrial Development Park.
Pacific Northern Gas
A 10-inch natural gas pipeline runs along the southeast edge of the broader industrial area, currently operating at approximately 20% capacity.
Telus Fibre
High-speed fibre-optic telecommunications infrastructure is available in the Terrace area.
Water & Site Servicing
Municipal water has been announced for the area, with availability estimated for early 2028. Well water is common in the interim; site-specific connection and servicing to be confirmed during diligence.

Regional utility information is drawn from the City of Terrace SIDP brochure and describes the broader Terrace industrial area, not parcel-specific connections.

Why Terrace

The demand engine behind the land

Terrace is the supply and service hub for one of Canada's most active industrial corridors — LNG exports, mining, port logistics, and heavy construction.

LNG Canada
Canada's first LNG export terminal
Canada's first LNG export terminal at Kitimat (~64 km). Phase 2 would double capacity to 28 mtpa — a proposed ~$30–33B expansion targeting a 2026 FID.
2 ports
Prince Rupert & Kitimat
Two deep-sea ports within 137 km. Prince Rupert is Canada's closest port to Asia; Kitimat hosts LNG Canada and the Rio Tinto smelter.
Golden Triangle
BC's richest mining district
One of the world's most prolific mineral districts — operating mines (Brucejack, Red Chris) and major proposed projects (KSM, Galore Creek) drive sustained demand for industrial land.
$6B
Rio Tinto Kitimat smelter
The Rio Tinto aluminum smelter at Kitimat underwent a $6 billion modernization — one of the largest private investments in BC history.
CN Rail
Fastest port-to-heartland rail
CN Rail provides the fastest rail connection from a BC port to the US Midwest and Ontario — the transcontinental backbone for the region's export economy.
Cedar & Ksi Lisims
Next-wave LNG projects
The Haisla-led Cedar LNG and the Nisga'a-led Ksi Lisims LNG (~$10B) projects extend the region's export pipeline.

Major Regional Projects

Billions in committed and proposed capital within the Northwest BC industrial corridor — the demand engine behind laydown, warehousing, and servicing needs in the Terrace area.

Project Sector Status Capital / Value
LNG Canada — Phase 1 LNG export Operational ~$40B CAD (incl. Coastal GasLink)
LNG Canada — Phase 2 LNG export Proposed — FID targeted 2026 ~$30–33B CAD (doubles capacity to 28 mtpa)
Coastal GasLink Pipeline Gas transmission Operational ~$14.5B CAD
Cedar LNG LNG export Approved Haisla Nation–Pembina partnership
Ksi Lisims LNG LNG export Proposed ~$10B CAD (Nisga'a Nation)
Rio Tinto Kitimat Smelter Aluminum Operating (modernized) $6B modernization
KSM Mine Copper-gold Proposed ~$5.2B initial capital
Galore Creek Mine Copper-gold-silver Proposed (prefeasibility) ~$5.2B CAD capital estimate
Brucejack Mine Gold-silver Operating $3.5B (Newcrest acquisition)
Red Chris Block Cave Copper-gold DFS — FID 2026 $500M federal commitment (+1,800 jobs)
Schaft Creek Copper-moly-gold Prefeasibility (Teck 75%)
Tatogga / Saddle North Copper-gold Exploration (Newmont) $456M (GT Gold acquisition)

Source: City of Terrace — SIDP brochure; Government of Canada — Major Projects Office; Newmont; Teck Resources; BC Geological Survey. Capital figures are from publicly reported sources and are subject to change.

FAQ

Frequently asked questions

Key details about the parcels, zoning, utilities, and leasing options.

What uses are suitable for Talstra Lands?

The parcels are suited to laydown yards, warehousing and distribution, office/warehouse bays, fleet and Class 8 truck servicing, LNG and mining supply, and build-to-suit facilities. Lots A and B (M2) accommodate heavier industrial uses; Lots C and D (M4) are suited to lighter-format industrial.

What is the zoning of the parcels?

Lots A and B are zoned M2 Heavy Industrial. Lots C and D are zoned M4 Light Industrial. A separate C3 Service Commercial rezoning application is under review for Lots C and D — approval is not guaranteed, and they retain M4 zoning in the meantime.

How far is the site from Prince Rupert and Kitimat?

The site is 137 km from the Port of Prince Rupert (Canada's third-largest container terminal) and 64 km from the Port of Kitimat (LNG Canada, Rio Tinto smelter). CN Rail runs approximately 10 km from the site, and the Northwest Regional Airport is immediately adjacent.

Is municipal water available?

Municipal water has been announced for the area, with availability estimated for early 2028. Well water is common in the interim. Site-specific connection and servicing details to be confirmed during diligence.

Can parcels be leased individually?

Yes. The four parcels can be leased individually or together. Total area is 16.85 acres across four contiguous parcels on Jack Talstra Way — ranging from 1.97 to 6.82 acres each.

What is the status of the C3 rezoning for Lots C and D?

The C3 Service Commercial rezoning is an application under review by the City of Terrace. It is not an approval. Lots C and D retain their M4 Light Industrial zoning while the application is pending.

Now accepting leasing inquiries

Lease land, build to suit, or stage your operation at the crossroads of Northwest BC. Request the leasing package or arrange a site tour.

Contact

Let's talk about your requirements

Tell us about your operation and we'll follow up with parcel details, terms, and next steps.

Email

Phone